How much is the decoration of 64 square meters sma

2022-07-22
  • Detail

Project 1: Foundation Engineering

shovel the wall skin (gypsum ash) 639.60

wall blank base treatment 319.80

wall/ground cement mortar leveling 555.90

seal the door head 206.40

door pocket base (Blockboard) 77.00

remove the brick wall (240 mm) 109.00

remove the original doors and windows and cover 55.00

paint the hole, beam bottom and other parts after removing the wall 171.00

project 2: Waterway Circuit engineering

strong and weak current construction (lump sum price) 4608.00

waterway construction (lump sum price) 1550.00

strong and weak current box installation 100.00

balcony water outlet 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1341.00

latex paint 536.40

shoe cabinet (including door, ecological board) 1711.20

Paste ceramics skirting 225.00

floor tile general specification (500 × 500< Size ≤ 800 × 800)1092.72

昆明外阴白斑医院

济南妇产医院

沈阳妇科医院

Copyright © 2011 JIN SHI